    When flying under Part 135, is it legal to takeoff knowing that you will exceed the allowable duty time due to an unplanned delay after the start of taxi?

    135.267(d) says:

    Each assignment under paragraph (b) of this section must provide for at least 10 consecutive hours of rest during the 24-hour period that precedes the planned completion time of the assignment.

    So if the determining factor is the planned completion time of the assignment, am I good if my passengers showed up late on an earlier leg, or if I have to wait at the runway for 30 minutes before I takeoff if it will cause me to exceed the limit?

  • Note that if you operate under §135.267(b), that there isn't any specific duty time definition -- there are only regulations concerning the maximum flight time and minimum rest time in §135.267(d) (see this question for the definition of rest time). In a FAA Civil Penalty Order, it is noted that duty time is:

    any time that is not a rest period.

    If you're operating under §135.267(c), "a regularly assigned duty period" is also not defined, however, a legal interpretation in 2009 states that:

    a pilot under a regularly assigned duty period "comes to work and ... goes home at the same time every day".

    Now the question is, whether late passengers or being held up by ATC would be considered as affecting "the planned completion time of the assignment". The FAA has held in prior legal interpretations that:

    delays caused by late passenger or cargo arrivals, maintenance difficulties, and adverse weather are beyond the control of the certificate holder.

    And in another legal interpretation:

    delays due to air traffic control, mechanical problems, or adverse weather could constitute circumstances that are beyond the control of the certificate holder.

    However, it is noted that these provisions only apply if the original schedule was realistic. For example, if it is typical that ATC will place aircraft into a hold for 1 hour and this is not taken into account, this could be considered an "unrealistic" schedule for the purposes of §135.267.

    Note that if no initial "planned completion time of the assignment" was calculated prior to accepting an assignment though, then "being late" may not be a legal defence if taken to court. In 1995, a case involving Charter Airlines, Walker and Mort questioned whether it was a violation of §135.267(b) & §135.267(d) to accept a flight even when it was known that the cargo would be late to arrive.

    Because it was found that there was no "planned completion time of the assignment", they were on duty when waiting for the cargo (and therefore not "free of all obligations") and they had accepted the assignment after it was aware that the incoming cargo would be late, the FAA issued civil penalties amounting to \$10000 for Charter Airlines, and \$2000 each for Walker and Mort.

  • I believe that the law applies to the information provided the flight plan. Since this document is often used for lawful evidence in other areas of aviation, it would make sense for this to be what is used for "planned" flight.

Related questions and answers
  • When flying under Part 135, is it legal to takeoff knowing that you will exceed the allowable duty time due to an unplanned delay after the start of taxi? 135.267(d) says: Each assignment under paragraph (b) of this section must provide for at least 10 consecutive hours of rest during the 24-hour period that precedes the planned completion time of the assignment. So if the determining factor is the planned completion time of the assignment, am I good if my passengers showed up late on an earlier leg, or if I have to wait at the runway for 30 minutes before I takeoff

  • Most 135 training/testing says something like this: §135.343 Crewmember initial and recurrent training requirements. No certificate holder may use a person, nor may any person serve, as a crewmember in operations under this part unless that crewmember has completed the appropriate initial or recurrent training phase of the training program appropriate to the type of operation... months) but I haven't been to training yet, so 135.323 doesn't really apply. From my interpretation of the regulations I would say no, however every 135 company that I have ever flown

  • 14 CFR 135, Subpart F contains the rest requirements for Part 135 operations. The rest requirement for 1 and 2 pilot unscheduled crews (typical) comes from: 135.267(d) Each assignment under paragraph (b) of this section must provide for at least 10 consecutive hours of rest during the 24-hour period that precedes the planned completion time of the assignment. What does the FAA consider rest and what actions by the company will interrupt the required rest?

  • specifically for [II.A.2.] Total time in this make/model and/or approved FFS or FTD (Hrs.) Furthermore, according to the IACRA FAQ ("I'm a Designated Examiner. I noticed a mistake when reviewing the IACRA... plane was fine, and I can't find any Part 61 regulations that are specific to experience in one make/model aside from adding an experimental aircraft as part §61.63(h)(1), which is what I assume...I'm a student pursuing a US Private Pilot License, and recently scheduled my checkride. I've been training in a 1981 Piper Warrior (PA-28-161), but if its annual goes sour I may have to take my

  • You are asked to fly a 91 owner trip to a destination. A 135 trip comes up after your owner flight. Does your 135 duty time start when company asked you to fly the 91 owner flight?

  • StallSpin's answer on the recent question about VFR traffic patterns has got me thinking about the "Remarks" section of the Airport/Facility Directory. We are all taught in training to review the AFD entry for airports we intend to visit (part of FAR 91.103's "become familiar with all available information" requirement), and to comply with any restrictions noted - typically things like "no touch-and-go landings", "Standard traffic pattern required of all aircraft", "Prior Permission Required for jet aircraft", etc. Aside from it being The Right Thing To Do, and avoiding the possibility

  • Part 135 and (I believe) Part 121 operations all have a requirement to use a source of weather that has been approved by the U.S. National Weather Service: §135.213 Weather reports and forecasts. (a) Whenever a person operating an aircraft under this part is required to use a weather report or forecast, that person shall use that of the U.S. National Weather Service, a source approved by the U.S. National Weather Service, or a source approved by the Administrator. However, for operations under VFR, the pilot in command may, if such a report is not available, use weather

  • 14 CFR 1.1 includes the following definitions related to crewmembers: Crewmember means a person assigned to perform duty in an aircraft during flight time. Flightcrew member means a pilot, flight engineer, or flight navigator assigned to duty in an aircraft during flight time. Some of the regulations (although not all instances) also refer to a required crewmember. Anecdotaly I have heard of people being assigned as a crewmember on the spot so that they could fly in an aircraft that is limited to "crewmembers only" (i.e. some world war two era aircraft, etc.) by saying something

  • : Canada requires you to hold the certificate (Radiocommunications regulations, Part V, Section 33): A person may operate radio apparatus in the aeronautical service, maritime service or amateur radio service only where the person holds an appropriate radio operator certificate [...] However, I can't find a regulation saying I need the piece of paper with me. An example of the wording Canada..., and the certificate, when exercising those privileges. I can't find that wording or anything like it relating to my radio operator's certificate in the CARS, the Radiocommunications Regulations

  • I hope this is a relevant place for me to ask a math question regarding aircraft design. I am trying to understand how one would implement a controller to control the pitch angle of an airplane for a small exercise. I understand the control part and its implementation. What I do not grasp is how one acquires the longitudinal equations of motions (which are then used for the control part) which serves as the starting point. What is the starting point or what are the principles used to derive these equations? If I know how to derive these equations for a very simple case, then I know I have